0% Finance now available. Pay by instalments on orders over £500!
Send Your Plan

Nuaire - MRXBOXAB-ECO3 Unit

More Views

Interest Free EMI
Nuaire - MRXBOXAB-ECO3 Unit
£1,075.20 including VAT Excluding VAT £896.00
Nuaire - MRXBOXAB-ECO3 Unit
Description

Details

Nuaire - MRXBOXAB-ECO3 Unit

Cost efficient and good value for money MVHR unit with summer By-pass and humidity sensor control

The Nuaire - MRXBOXAB-ECO3 Unit is a wall or cupboard mounted MVHR system designed specifically for houses and apartments.

It incorporates the latest generation of low voltage DC fans, counter flow heat exchanger and easily accessible controls. The heat exchanger block can recover up to 93% of the heat which would normally be wasted, giving this product a high score on SAP Appendix Q and helping you meet building regulations.

  • Up to 93% Heat recovery 
  • 320m3/h @100pa suitable for houses with Max floor area of 200m2
  • Summer Bypass
  • Integral humidity sensor 
  • Specific fan power as low as 0.59 wls
  • 100% Adjustable air flow rates
  • G3 filters
  • Frost protection
  • Multiple control options
  • SAP Appendix Q listed
  • 5 Year Warranty
  • Developed and manufactured in the UK
  • 4 x 150 spigots
  • Dimensions (mm) 654 / 609 / 431

Digital controller also available (VSC)

Technical Specification

Technical Specification tab

Nuaire WH1 technical page

Download Documentation
Nuaire WH1 Catalogue
Nuaire WH1 installation
Further Information

How to install a Nuaire WH1 MVHR unit


Nuaire WH1 Wiring Requirements



  • 3amp switched spur beside unit

  • Optional boost switch - 4 core 1.0mm cable from recessed single box to unit (recommended if bathrooms are further than 5 meter from unit)

  • Digital controller- Comes complete with 15 meter of 6 core alarm cable with a RJ45 connection


Commissioning



  • The low and high speed levels can be adjusted using the digital control

  • further controls include- night time set speed set back - timed boost- sensor control - humidity sensor control - temperature control - summer bypass control - fault indication - filter indicator


Installation Guide


Nuaire WH1 1st Fix



  1. Position Nuaire WH1 unit proverbially on a wall or vertical timber frame with provided wall bracket

  2. Install wiring for controllers (see top of page for further details)

  3. Install condensation drain from unit to internal or external drain

  4. Install wall /Soffit vents or roof vents (Minimum 1.5 meter apart) Pipes are 150mm diameter

  5. Position distribution boxes in the chosen location (proverbially in a central location minimising duct lengths )

  6. Install silencer (if specified) to air supply distribution box

  7. Install solid rigid duct-work and between distribution boxes and MVHR unit, (If possible allow for insulated flexible duct-work for final connections of MVHR unit )

  8. Install radial pipe into the distribution box ,

  9. Cut to length and install pipe into ceiling plenum, (insure you install rubber seal onto pipe) secure pipe in place with fixing band or pipe clips


Warning! There can be either one or two pipes going from the distribution box to the plenum depending on the required airflow , Always check plan that will indicate 1 or 2 pipes Install insulated rigid or insulated flexible duct-work to external vents Seal all open pipes to prevent debris and moisture ingress


 


Nuaire WH1 2nd fix



  1. Trim ceiling Plenums to height of plasterboard (Easier to do before plastering ceilings)

  2. Install air valves to plenums (slightly open valve by two turns)

  3. Install all controllers

  4. Check that condensation drain has been fitted

  5. Switch unit on and follow the set up procedures

  6. Check air flow rates and commission system



Initial Design -


Pre designed plan - Please follow the plan ensuring the correct number of pipes to each area - Please note the plan is only a guide and you may have to reroute pipe work differently and reposition valves to suit layout of rooms


No Plan - If a design is not possible due to renovation, Retrofit or properties with multiple obstacles simply follow the listed recommendations


We would recommend that you



  • Install 2 x pipes from the distribution box to the room air plenum if air flow requirement exceed 10 L/s or if length over 15 meters  

  • Install 2 x pipes from the distribution box to the air extract plenum in the main shower rooms and Kitchen

  • All other areas only require a single pipe from the distribution box to the room air plenum

  • Radial duct-work is suitable to be fitted below your loft insulation providing superior heat retention Insulate any duct-work or Manifold/ Distribution boxes with a minimum of 25mm thermal duct wrap that go above insulation in unheated attic spaces

  • Slim-line manifolds are suitable for installation to concrete ceilings and only require a 100mm service void

  • Position supply plenums approx. 500mm from corner of wall (avoid areas above beds and wardrobes)

  • Position extraction plenums to outside of showers and above kitchen sink (not cooker)

  • Only extract from a room with a open appliance (stove) if there is a supply with equal or higher airflow

Reviews

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.